Widow’s Hole Preserve · Greenport
The Peconic Land Trust turned an abandoned oil terminal into a beloved public beach and salt marsh. Since 2019, storms have stripped away the dune that protects it. A restoration plan has local approval and is awaiting the final DEC permit, and your letter of support helps.
2019 – 2026
Where things stand · October 2026
Since 2019
Picture 200 to 300 pickup trucks, beds filled level with sand. That is how much the storms have carried off this one small stretch of shore. Parked bumper to bumper, the trucks would stretch about a mile. The sand weighs roughly 600 to 900 tons, or about 45 to 65 loads for a ten-yard dump truck.
Estimates, not a survey. How they were made.
Where the sand went
How the estimates were made is in the full record at the bottom of this page.
A hazard for swimmers
Erosion is not only on the harbor side. When the Village approved the restoration in 2020, it required the old terminal’s exposed metal remnants to be removed to a couple of feet below grade, to protect boaters and swimmers.1 Just a few years later, remnants of the old bulkheading and pipe are back at the surface on the Widow’s Hole side of the preserve.
That is how much sand this beach has lost, and the jagged pieces are a real hazard for people who swim and wade in Widow’s Hole.
Why it matters
This is the beach where Greenport’s children planted a salt marsh, where neighbors launch kayaks and paddleboards, and where people sit on the sand to watch the North Ferry cross. It is the south shore of Widow’s Hole, the little cove that has sheltered the village’s small boats for more than a century. Every foot of bank that goes takes upland habitat, the young marsh’s protection and public beach with it. Left alone, the Trust itself has warned, the preserve is “vulnerable to sea level rise and the impacts of future storms.”
What the restoration needs now is the final DEC permit, and every storm season of waiting means more sand lost and a larger repair.
What we built together
For sixty years this corner of Greenport was an oil terminal. From the mid-1920s to the mid-1980s, barges unloaded fuel oil, kerosene and gasoline into six above-ground tanks at the foot of Fourth Street. When the terminal closed, it left a fenced lot of contaminated sand, broken bulkhead and pipe ends. The wharf, tanks and buildings came down and the environmental cleanup was finished in the early 2000s, but for years the land sat empty and the shore kept eroding.
Then the community got a second chance. In 2012 ExxonMobil gave the land to the Peconic Land Trust, with a conservation easement to the Town of Southold and the Village of Greenport, so it can never be developed. In 2016 the Trust had the terminal’s exposed pipes and old seawalls cut off a couple of feet below the sand so the beach would be safe to walk barefoot. And in the spring of 2019, with Cornell Cooperative Extension and funding from the Peconic Estuary Program, the Trust built the first living shoreline in the Peconic Estuary.
It was a wonderful thing to watch. Truckloads of clean sand were shaped into a dune. A 130-foot line of boulders, each about three feet across, was laid along the foot of the bank and then buried under the new dune as a hidden anchor. Volunteers planted thousands of beachgrass culms one foot apart. That June, Greenport’s schoolchildren knelt in the mud to plant salt-marsh cordgrass, nearly ten thousand plants in all. An old industrial shoreline became a beach, a marsh, a place to launch a kayak, walk a dog and watch the ferries cross to Shelter Island. It belongs to all of us.
Your voice counts
The restoration is awaiting the DEC’s final permit. A short, personal letter of support to the DEC tells the State that Greenport wants this work done. Three sentences is enough: who you are, how you use the preserve, and that you support the restoration.
The one thing to do
Pick the email you use. It opens a ready-to-send letter to NYSDEC Region 1 Environmental Permits, copied to Greenport’s Mayor and to Matt Swain at the Peconic Land Trust, so the Trust has a record of your support. Fill in your name, add a sentence of your own if you like, and send.
Send it from your email (opens a ready-to-send message):
Gmail Outlook.com Yahoo Mail Phone or computer mail app
Or copy and paste into any email:
To the NYSDEC Region 1 Division of Environmental Permits:
I am writing as a [resident of Greenport / neighbor / regular visitor] in support of the Peconic Land Trust’s full restoration effort at Widow’s Hole Preserve in Greenport: the shoreline restoration (DEC application 1-4738-01041/00010) and the dredging of the cove entrance (DEC application 1-4738-01041/00013).
The preserve turned a former oil terminal into a public beach and salt marsh that our community uses every day. Since 2019, storms have stripped much of the dune that protects it; the boulders built to sit under the dune are now fully exposed, and sand from the failing shoreline has filled in the mouth of the cove. [Add a sentence about how you use the preserve.]
I support the full restoration effort and respectfully ask the Department to complete its review and issue both permits so the work can begin before more of the shoreline is lost.
Sincerely,
[Name]
[Address]
Prefer paper? NYSDEC Region 1, Division of Environmental Permits, SUNY at Stony Brook, 50 Circle Road, Stony Brook, NY 11790 · (631) 444-0365. Refer to DEC applications 1-4738-01041/00010 and 1-4738-01041/00013 (Widow’s Hole Preserve). If you copy the letter or mail it, please also send a copy to MSwain@peconiclandtrust.org.
Mayor & Board of Trustees
mayor@villageofgreenport.gov
Village Clerk: chall@villageofgreenport.gov
236 Third Street, Greenport, NY 11944 · (631) 477-0248
Thank the Board for its support and ask it to keep urging the DEC.
Supervisor & Town Board
Town Hall, 53095 Main Road, P.O. Box 1179
Southold, NY 11971 ·
(631) 765-1889
southoldtownny.gov
The Town co-holds the preserve’s conservation easement and supported the Trust’s restoration grant.
Widow’s Hole Preserve
MSwain@peconiclandtrust.org
296 Hampton Road, P.O. Box 1776, Southampton, NY 11969 ·
(631) 283-3195
Let the Trust know you’re behind it, or help fund the work.
Dear [Mayor and Trustees / Supervisor and Town Board],
Thank you for supporting the Peconic Land Trust’s restoration of Widow’s Hole Preserve. As a [resident / neighbor], I value this beach and salt marsh, and I have watched storms strip away the dune since 2019.
Please continue to voice the [Village’s / Town’s] support to the NYS DEC so the restoration permits are issued and the work can begin.
Sincerely,
[Name]
[Address]
Dear Peconic Land Trust,
Thank you for restoring Widow’s Hole Preserve. As a [resident / neighbor], I support the full restoration effort and have written to the DEC in support of the permits. Please let me know how else I can help.
Sincerely,
[Name]
Full bibliography on the Sources page. Spot an error? Send a correction.
On the ground & from the air · 2019 – 2026

Winter storms have cut the dune’s sloping face into a vertical sand cliff, and the boulders stand exposed along their whole seaward side. Measured against the three-foot stones, the scarp rises another one to two feet above them, so the bank is now about four to five feet high.

Whole blocks of the beachgrass planted by volunteers in 2019, roots and all, have broken off the bank and slid down onto the boulders.

The boulders now sit out on the open beach as a separate row of rock. The bank has drawn back behind them and the sand between has dropped.

The full run of boulders along the preserve. In the foreground is the salt marsh planted in 2019, the part of the project that is thriving.
The four frames below show the same 80-meter square of shoreline, lined up on fixed landmarks (the streets and the preserve’s map marker) and printed at the same scale. In September 2019, five months after construction, the new dune is a broad pale band about 28 feet wide between the trees and the beach. The boulder toe is somewhere under it, and the yellow dashes show where it lies. By April 2021 the boulders appear from the air as a dark line along their whole length, and they are still exposed in 2023 and 2026. Measured on the 2026 frame, the visible line runs about 45 meters (roughly 150 feet).
The boulders themselves have not moved. Their position matches to within about half a meter from 2021 to 2026. The sand that covered them has moved.




How to read these. North is up and the harbor is to the right. The scale bar in each frame is 20 m (66 ft). Google’s imagery is about 20–25 cm per pixel, and dates are from Google’s historical-imagery timeline. Vertical change (how far the sand has dropped) can’t be seen from above. For that, see the ground photographs above.
How these estimates were made. Every figure on this page is estimated from dated photographs and Google Earth aerial imagery, using the 2019 design as a reference. Scale: the Peconic Estuary Program’s final report specifies boulders about 3 feet across, in a line about 130 feet long, buried under roughly 900 cubic yards of sand (about 430 in the dune, 470 on the beach face). Sand lost at the boulders: none showed in April 2019; since 2021 they show their full height on both faces, a drop of at least 3 feet. Bank: about 10–12 feet behind the boulders, roughly three boulder-widths in the photographs. Volume: about 60–80 sq ft per running foot lost from the dune behind the stones, plus 2–3 feet off the beach face in front of them, about 85–125 sq ft per foot in all. Over 130–150 feet of shoreline, that is roughly 12,000–17,500 cubic feet (450–650 cubic yards). Truckloads: a full-size pickup bed holds about 60 cubic feet filled level, so 200–300 beds; at about 100 lb per cubic foot, 600–900 tons, or 45–65 ten-yard dump-truck loads. Aerials: aligned on streets and the preserve marker; the boulder line plots to within about half a meter in 2021, 2023 and 2026.
If a survey becomes available, we will refine these figures and amend this page.