Widow’s Hole Preserve · Greenport

Save the Shore

The Peconic Land Trust turned an abandoned oil terminal into a beloved public beach and salt marsh. Since 2019, storms have stripped away the dune that protects it. A restoration plan has local approval and is awaiting the final DEC permit, and your letter of support helps.

Write a letter of support →

2019 – 2026

How much has changed

April 2019 April 2019: the completed living shoreline, a smooth sand dune being planted with beachgrass, no boulders visible
Living shoreline completed. A smooth, planted dune; the boulders are buried out of sight. Photo courtesy of the Peconic Land Trust
November 2020 November 2020: the tops of the boulders begin to show through the sand
The first rocks appear. Storms shave the dune and the tops of the boulders break the surface.
February 2021 February 2021: the dune cut into a steep sand cliff behind fully exposed boulders
The dune collapses. Winter storms cut the dune into a sand cliff behind fully exposed boulders.
October 2026 October 2026: the boulders stand free on the open beach, the dune gone
Today. The boulders stand free on the open beach, about ten to twelve feet out from the eroded bank.

Where things stand · October 2026

The restoration plan

Applicant
Peconic Land Trust, owner of Widow’s Hole Preserve
The plan
Restore the area to its prior condition: a band of boulders below the waterline to break waves (approved by the Village for about 225 feet of shore), new sand and native plantings, an accessible walkway to the water, and dredging the mouth of Widow’s Hole, which filled in as sand from the failing shoreline washed into it.1, 3
Local approval
The Village of Greenport Board of Trustees approved the restoration’s wetlands permit by resolution on October 22, 2020.1 New York’s Department of State has completed its coastal review.2
Status
Awaiting final approval from the NYS Department of Environmental Conservation (DEC).3
Public support
Greenport’s Village Board (2020 resolution; letter of support to the DEC drafted in 2024)4 and the Town of Southold (letter of support for the Trust’s restoration grant, 2021).5

Write a letter of support →

Where the sand went

The shore in cross-section

Schematic cross-section of the Widow's Hole Preserve shoreline, 2019 versus 2026 In 2019 the dune slopes up from the beach and completely covers a three-foot boulder. By 2026 the sand in front of and behind the boulder is gone, the boulder stands exposed on the beach, and the bank has been cut back to a steep scarp about ten to twelve feet behind it. The area between the two profiles, the sand lost, is shaded. harbor 2019 · as built (dashed) 2026 · today (solid) sand lost boulder ≈ 3 ft sand surface ≈ 3–4 ft lower ≈ 10–12 ft bank cut to a steep scarp 10 ft vertical scale exaggerated about 2×
Schematic only, estimated from photographs and the published 2019 design. It is not a survey. Across a typical section, the loss is roughly 85–125 square feet of sand per running foot of shoreline, counting the beach face in front of the stones.

How the estimates were made is in the full record at the bottom of this page.

A hazard for swimmers

Old bulkheading is back on the Widow’s Hole side of the beach

Erosion is not only on the harbor side. When the Village approved the restoration in 2020, it required the old terminal’s exposed metal remnants to be removed to a couple of feet below grade, to protect boaters and swimmers.1 Just a few years later, remnants of the old bulkheading and pipe are back at the surface on the Widow’s Hole side of the preserve.

That is how much sand this beach has lost, and the jagged pieces are a real hazard for people who swim and wade in Widow’s Hole.

October 2026: broken concrete fragments and a white cut pipe end exposed among beach cobble
October 24, 2026 — Concrete rubble and a cut pipe end from the old terminal’s waterfront, exposed at the wrack line.
October 2026: jagged concrete fragments and a pipe end protruding from the beach
October 24, 2026 — Remnants of the old bulkheading exposed on the Widow’s Hole side.

Why it matters

What we stand to lose

This is the beach where Greenport’s children planted a salt marsh, where neighbors launch kayaks and paddleboards, and where people sit on the sand to watch the North Ferry cross. It is the south shore of Widow’s Hole, the little cove that has sheltered the village’s small boats for more than a century. Every foot of bank that goes takes upland habitat, the young marsh’s protection and public beach with it. Left alone, the Trust itself has warned, the preserve is “vulnerable to sea level rise and the impacts of future storms.”

What the restoration needs now is the final DEC permit, and every storm season of waiting means more sand lost and a larger repair.

What we built together

From tank farm to treasure

For sixty years this corner of Greenport was an oil terminal. From the mid-1920s to the mid-1980s, barges unloaded fuel oil, kerosene and gasoline into six above-ground tanks at the foot of Fourth Street. When the terminal closed, it left a fenced lot of contaminated sand, broken bulkhead and pipe ends. The wharf, tanks and buildings came down and the environmental cleanup was finished in the early 2000s, but for years the land sat empty and the shore kept eroding.

Then the community got a second chance. In 2012 ExxonMobil gave the land to the Peconic Land Trust, with a conservation easement to the Town of Southold and the Village of Greenport, so it can never be developed. In 2016 the Trust had the terminal’s exposed pipes and old seawalls cut off a couple of feet below the sand so the beach would be safe to walk barefoot. And in the spring of 2019, with Cornell Cooperative Extension and funding from the Peconic Estuary Program, the Trust built the first living shoreline in the Peconic Estuary.

It was a wonderful thing to watch. Truckloads of clean sand were shaped into a dune. A 130-foot line of boulders, each about three feet across, was laid along the foot of the bank and then buried under the new dune as a hidden anchor. Volunteers planted thousands of beachgrass culms one foot apart. That June, Greenport’s schoolchildren knelt in the mud to plant salt-marsh cordgrass, nearly ten thousand plants in all. An old industrial shoreline became a beach, a marsh, a place to launch a kayak, walk a dog and watch the ferries cross to Shelter Island. It belongs to all of us.

April 2019: two volunteers planting beachgrass on the smooth, freshly built sand dune at Widow's Hole Preserve, with no rocks visible
April 2019 · as built — Beachgrass going into the newly graded dune. Somewhere under this sand lies the boulder toe. Not one stone is visible. Photo courtesy of the Peconic Land Trust
April 2019: volunteers planting rows of beachgrass along the new dune at Widow's Hole Preserve; a white one-meter monitoring square lies on the sand
April 2019 · planting day — Volunteers with the Trust, Cornell Cooperative Extension and the Peconic Estuary Program set beachgrass in rows. The white square is a one-meter monitoring plot. The dune runs as a smooth, broad ramp from the trees to the beach. Photo courtesy of the Peconic Land Trust

Notes & sources

  1. Village of Greenport, Board of Trustees regular meeting, October 22, 2020, Resolutions #10-2020-10 (SEQRA) and #10-2020-11 (wetlands permit for shoreline restoration, including boulders up to 3 ft along about 225 ft of shoreline). Agenda (PDF).
  2. NYS Department of State, coastal consistency General Concurrence for the Trust’s modified Widow’s Hole restoration, file F-2022-0351, July 7, 2022.
  3. NYSDEC permit application database (DART), facility “Widow’s Hole Preserve,” checked October 31, 2026. DART search.
  4. The Suffolk Times, “Village trustees draft letter of support for Widow’s Hole Preserve restoration.”
  5. Local newspaper report, summer 2021: “Southold Town has agreed to provide a letter of support” for the Trust’s restoration grant application.

Full bibliography on the Sources page. Spot an error? Send a correction.

On the ground & from the air · 2019 – 2026

The full record

  1. January 2021: a vertical sand cliff stands behind a continuous row of fully exposed boulders
    January 10, 2021

    A cliff where the dune was

    Winter storms have cut the dune’s sloping face into a vertical sand cliff, and the boulders stand exposed along their whole seaward side. Measured against the three-foot stones, the scarp rises another one to two feet above them, so the bank is now about four to five feet high.

  2. February 2021: clumps of beachgrass with roots attached have collapsed from the bank onto the boulders
    February 26, 2021

    The 2019 planting falls in

    Whole blocks of the beachgrass planted by volunteers in 2019, roots and all, have broken off the bank and slid down onto the boulders.

  3. November 2024: the boulders sit as a separate line on the open beach, with the bank pulled back behind them
    November 24, 2024

    Three more storm seasons

    The boulders now sit out on the open beach as a separate row of rock. The bank has drawn back behind them and the sand between has dropped.

  4. October 2026: the full boulder line seen from the south, with the planted salt marsh in the foreground
    October 24, 2026

    The whole line

    The full run of boulders along the preserve. In the foreground is the salt marsh planted in 2019, the part of the project that is thriving.

From the air

The four frames below show the same 80-meter square of shoreline, lined up on fixed landmarks (the streets and the preserve’s map marker) and printed at the same scale. In September 2019, five months after construction, the new dune is a broad pale band about 28 feet wide between the trees and the beach. The boulder toe is somewhere under it, and the yellow dashes show where it lies. By April 2021 the boulders appear from the air as a dark line along their whole length, and they are still exposed in 2023 and 2026. Measured on the 2026 frame, the visible line runs about 45 meters (roughly 150 feet).

The boulders themselves have not moved. Their position matches to within about half a meter from 2021 to 2026. The sand that covered them has moved.

Aerial view, September 2019: a wide pale sand dune covers the shoreline; dashed line marks the buried boulder toe
Aerial view, April 2021: the boulder line is clearly visible as a dark line along the beach
Aerial view, May 2023: the boulder line remains exposed
Aerial view, May 2026: the boulder line exposed, with only a narrow strip of sand behind it

How to read these. North is up and the harbor is to the right. The scale bar in each frame is 20 m (66 ft). Google’s imagery is about 20–25 cm per pixel, and dates are from Google’s historical-imagery timeline. Vertical change (how far the sand has dropped) can’t be seen from above. For that, see the ground photographs above.

How these estimates were made. Every figure on this page is estimated from dated photographs and Google Earth aerial imagery, using the 2019 design as a reference. Scale: the Peconic Estuary Program’s final report specifies boulders about 3 feet across, in a line about 130 feet long, buried under roughly 900 cubic yards of sand (about 430 in the dune, 470 on the beach face). Sand lost at the boulders: none showed in April 2019; since 2021 they show their full height on both faces, a drop of at least 3 feet. Bank: about 10–12 feet behind the boulders, roughly three boulder-widths in the photographs. Volume: about 60–80 sq ft per running foot lost from the dune behind the stones, plus 2–3 feet off the beach face in front of them, about 85–125 sq ft per foot in all. Over 130–150 feet of shoreline, that is roughly 12,000–17,500 cubic feet (450–650 cubic yards). Truckloads: a full-size pickup bed holds about 60 cubic feet filled level, so 200–300 beds; at about 100 lb per cubic foot, 600–900 tons, or 45–65 ten-yard dump-truck loads. Aerials: aligned on streets and the preserve marker; the boulder line plots to within about half a meter in 2021, 2023 and 2026.

If a survey becomes available, we will refine these figures and amend this page.